2026-08-31

Next

156-entity full Ship experiment.

The story the compile record itself writes is 38 → 156 → Ship. The 156-entity graph exists. Full Ship verification was intentionally not run.

26 entities completed the full Ship/P3 verification pipeline with a verified receipt. Evaluator probes were 133.197s of the 198.883s TTPS. That is the largest published verified end-to-end MAX-SCALE rung (26 entities / 52 surfaces / 317 files / 198.883s TTPS / P3 pass).

The current verified workload is evaluator-bound: live route probes interact with Next compile-on-demand. Evaluator duration on the 26-entity run was 133,197ms of 198,883ms TTPS.

Next test on the status strip: 156 ENTITY SHIP. Until that receipt exists, 156 stays COMPILE ONLY.

All lab notes